PROJECT TYPE
Hydroelectric
REGION/LOCATION
Gold Bridge, BC
START DATE
February 2021
COMPLETION DATE
February 2021
SCOPE OF THE WORK
Jewel was hired by BC Hydro to abrasive blast these intricate structures (followers) and recoat with two coats of epoxy. These followers were fabricated and used as part of the lifting apparatus at LaJoie dam for their intake gates.